CIPP < Product Design Information < Model Specifications
1.00 Scope
2.00 General
3.00 Pipe Materials—Cured-In-Place
4.00 Structural Requirements
5.00 Installation Procedures
6.0 National Envirotech Group License Agreement
1.00 Scope
This section of the specifications covers the reconstruction of existing sewer lines by insertion of the National Liner lining product into the host pipe by the cured-in-place pipe (CIPP) method.
2.00 General
- 2.01 Description of work:
It is the intent of this specification to provide for the reconstruction of existing sewer lines by forming a new pipe within an existing structurally deteriorated pipe that has generally maintained its original shape. The cured-in-place pipe (CIPP) shall provide flow capacity equal to or greater than 100 percent of the original pipe's flow capacity, when the pipe was new. The process is defined as the reconstruction of sewer lines by installation of a thermosetting resin impregnated flexible felt fiber tube with an impermeable inner surface. The resin-impregnated tube is formed to the hose pipe utilizing a water column. Curing is accomplished by circulating hot water (or other approved method) throughout the length of the tube to cure the thermosetting resin into a hard, impermeable pipe, in accordance with the specified curing schedule supplied by the resin manufacturer. The CIPP shall extend the full length of the original pipe and shall provide a structurally sound, impermeable, jointless and close fitting to the host pipe.
2.02 Reference of specifications:
This specification references American Society for Testing and Materials (ASTM) standard specifications, which are made a part hereof by such reference and shall be the latest edition and revision thereof.
F-1216 - Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin Impregnated Tube.
D-638 - Test Method for Tensile Properties of Plastics.
D-790 - Test Method for Tensile Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials.
Back To Top
3.00 Pipe Materials—Cured-In-Place
-
3.01 Flexible felt tube:
The tube shall consist of one or more layers of flexible needled felt material or an equivalent nonwoven or woven material capable of carrying resin and withstanding installation pressures and curing temperatures. The felt tubular material shall be lined on one side with a translucent waterproof coating such as polyurethane, polyethylene, or polyvinylchoride (PVC), and be fully impregnated with a liquid thermosetting polyester or vinylester resin and catalyst system compatible with the inversion process. The resin must be able to cure in the presence of water and the initialization temperature for cure shall be less than 180° F (82.2° C). The tubing shall be properly sized to the diameter of the wastewater pipe and the length of the wastewater main to be rehabilitated and be able to stretch to fit irregular pipe sections.
3.02 Resin/Catalyst:
The liquid thermosetting resin used to impregnate the tube shall produce a properly cured tube which will be resistant to abrasion due to solids, grit and sand. The cured tube shall also be resistant to corrosion due to acids and gases such as sulfuric acid, carbonic acid, hydrogen sulfide, methane and carbon monoxide. The resin selected shall have proven resistance to normal municipal sewage.
Polyester resin:
Polyester resin is created by reaction products between isophthalic/terathalic, maleic anhydride and a glycol characterized by reactive unsaturation located along the molecular chain. The resin is compounded with a reactive styrene monomer and reacted together with initiators/promoters to produce cross linked copolymer matrices.
Vinylester resin:
Vinylester resin is created by reaction products of epoxy resins with methacrylic acid and characterized by reactive unsaturation located in terminal position of the molecular chain. The resin is compounded with a reactive styrene monomer and reacted together with initiators/promoters to produce cross-linked copolymer matrices.
The chemical corrosion resistance of the actual resin system (neat plus modifications) selected shall be tested by the resin manufacturer in accordance with ASTM 1216-95. Sewage and chemical resistance tests are conducted with actual samples of the fluid flowing in the pipe.
Back To Top
4.00 Structural Requirements
- 4.01 Design criteria:
The CIPP thickness shall be calculated and designed based upon the following physical condition of the existing pipe to be rehabilitated.
- All pipes shall be designed in accordance with ASTM 1216-95 specifications.
- All pipes shall be subjected to soil load of 120 lbs./c. ft. with applicable.
- All pipes shall have a minimum of 2% ovality in the circumference.
Conditions 1 and/or 3 may change after the TV report, for later case-by-case design calculations.
- 4.02 Testing requirements:
- Chemical resistance
The CIPP pipe shall meet the chemical resistance requirements of ASTM F1216, Appendix X2. CIPP pipe samples for testing shall be tube and resin system similar to that proposed for actual construction. It is required that CIPP pipe samples without plastic coating meet these chemical testing requirements.
Back To Top
5.00 Installation Procedures
- 5.01 Safety:
The contractor shall execute his operations in strict accordance with all OSHA and manufacturer's safety requirements. Particular attention is required for those safety requirements involving working with scaffolding, entering confined spaces and operations with hot media.
5.02 Pre-installation:
- Inspection of pipeline
Inspection of pipeline shall be performed by experienced personnel trained in locating breaks, obstacles, and service connections by closed-circuit television. The interior of the pipeline shall be carefully inspected to determine the location of any conditions which may prevent proper installation of the lining into the pipelines, and it shall be noted so that these conditions can be corrected. The owner shall keep a videotape and suitable log shall for later reference.
A) Bypass pumping
The contractor shall provide for the flow of sewage around the section of sewer lines designated for lining. The bypass shall be made by plugging the line at an existing upstream manhole and pumping or directing the flow to a downstream manhole or adjacent sanitary sewer system. The pump(s) and bypass lines shall be of adequate capacity and size to handle the flow. Raw sewage shall be routed back to the sanitary sewerage system.
B) Pre-insertion cleaning
It shall be the contractor's responsibility to remove all debris located within the sewer pipe and dispose of debris in accordance with all applicable laws and regulations.
C) Pre-insertion television inspection
It shall be the responsibility of the contractor to conduct a videotape inspection of the sewer pipe immediately before insertion of the resin impregnated tube to assure that the pipe is clean and existing pipe conditions are acceptable for lining.
5.03 Resin impregnation:
The contractor will designate a location where the felt tube will be impregnated. The quantity of resin used for tube impregnation shall be sufficient to fill the volume of air voids in the tube with additional allowances for polymerization shrinkage and the loss of resin through cracks and irregularities in the original pipe wall. A vacuum impregnation process shall be used, and a and roller system shall be used to uniformly distribute the resin through out the tube.
5.04 Inversion using hydrostatic head:
The resin-impregnated felt tube shall be inserted through an existing manhole by means of an inversion ring or standpipe, capable of applying the hydrostatic head required to fully extend the tube to the next designated manhole or termination point. The tube shall be inserted into the inversion standpipe, then the tube shall be turned inside out and attached to the inversion standpipe so that a leak-proof seal is created. The inversion head shall be adjusted to a sufficient height to invert the tube from manhole to manhole and to hold it tightly against the existing pipe wall, producing dimples at side connections and flared ends at the manhole. Care shall be taken not to over-stress the felt tube at the elevated curing temperatures, which may cause damage or failure prior to cure.
5.05 Curing using circulated heated water:
After the inversion is completed, the contractor shall supply a suitable heat source and water recirculation equipment capable of delivering heated water throughout the section to uniformly raise the water temperature above the temperature required to effect a cure of the resin. The appropriate temperature shall be recommended by the resin/catalyst system manufacturer.
The heat source shall be fitted with suitable monitors to gauge the temperature of the incoming and outgoing water supply. Another such gauge shall be placed between the impregnated felt tube and the host pipe in the upstream and the downstream manhole at or near the bottom to determine the temperatures during cure. Water temperature in the line during the cure period shall not be less than 150° F or more than 200° F as measured at the heat source return line. Initial cure may be considered completed when the exposed portions of the felt tube pipe appear to be hard, and the remote sensing device indicates the temperatures to be adequate, as recommended by the resin/catalyst system manufacturer.
5.06 Cooling down:
The contractor shall cool the hardened CIPP to a temperature below 100 degrees Fahrenheit before relieving the water column. Cool water may be added to the water column while draining hot water from a small hole at the opposite end of the CIPP, so that a constant water column height is maintained until cool-down is completed. Care shall be taken in the release of the water column to avoid vacuum development, which could damage the newly installed CIPP.
5.07 Service connection:
After curing, the contractor shall reinstate the existing live building laterals designated by the construction engineer. All lateral services shall be reinstated within 24 hours of beginning the inversion process. This shall generally be done without excavation from the interior of the pipe by means of a television camera and a cutting device that reinstates the building laterals to not less than 90% of their original capacity. The contractor shall certify that he has a minimum of two (2) complete working units-plus spare key components-on the site before each inversion.
5.08 Final finish:
The finished pipe shall be continuous over the entire length of an inversion run between two manholes and be as free as commercially possible from significant defects.
Any defects which will affect, in the foreseeable future or warranty period, the integrity or strength of the pipe shall be repaired in a manner mutually agreed upon by the construction engineer and the contractor.
After the work is completed, the contractor shall provide the construction engineer with a videotape showing both the before and after condition, including the reinstated building lateral connections.
5.09 Clean up:
After the installation work has been completed and all testing acceptable, the contractor shall clean up the entire project area. All excess material and debris not incorporated into the permanent installation shall be disposed of by the contractor.
Back To Top
6.0 National Envirotech Group License Agreement
The contractor of the licensee shall not change any material, design values or procedural matters stated or approved herein, without prior knowledge and written approval of the National EnviroTech Group, LLC, technical committee. |
|